Public Safety | CAD & Systems Integration

Modernizing Emergency Response for a Safer Campus

AggreGateway helped San Diego State University Police Department upgrade its dispatch and records infrastructure to improve information flow, reliability, and response coordination.

Case Study

AggreGateway helped San Diego State University Police Department upgrade its dispatch and records infrastructure to improve information flow, reliability, and response coordination.

The Need

San Diego State University Police Department provides 24/7 policing and emergency-dispatch services for a campus of approximately 33,000 students. As call volumes grew, its aging computer-aided dispatch (CAD) environment created errors and connectivity challenges with essential justice, law-enforcement, and information-sharing systems. UPD needed a modern platform that could reduce manual work, connect structured and unstructured information, and improve coordination among dispatchers, officers, and partner agencies—without interrupting an always-on emergency dispatch center.

The Response

AggreGateway led a detailed discovery, network-engineering, systems-administration, and integration effort alongside UPD, SDSU IT, Sun Ridge Systems, Dell Technologies, IBM, AT&T, Verizon, and ARJIS. Following a four-week discovery phase, the team rebuilt core hardware, database and application servers, and supporting connectivity to enable the Sun Ridge CAD and Records Information Management System (RIMS) platform. The upgraded environment supports tools including E911 location information, mapping, mobile access for field officers, property and evidence management, and community-facing records access. AggreGateway completed upgrades and cutovers during off-peak hours to protect 24/7 dispatch availability.

The Impact

The modernized infrastructure creates a more connected operating environment, automatically routing incident information and keeping dispatchers and field responders aligned with current data. By reducing information silos and manual steps, the department can make faster, better-informed decisions during emergency response. Since the system cutover, UPD has experienced approximately zero downtime. The redundant, future-ready platform is designed to support new public-safety technologies and data types without requiring a full system replacement.

“

With public safety on the line, one of the most crucial performance factors of a 9-1-1 system is reliability.

With public safety on the line, one of the most crucial performance factors of a 9-1-1 system is reliability.

Jim Black

Senior Engineer, AggreGateway

Dispatch Operations:

24/7 continuity

System Reliability:

Approximately zero downtime

Platform Integration:

Integrated CAD and RIMS platform

Data Coordination:

Automated incident-data sharing

Next Case Study